Saturday, May 25, 2013

Spring reincarnation

After 3 weeks of work, the "new" kimosabi has been launched. Because kimosabi will be sailing in salt water during the winter months, the first week entailed sanding the old VC 17 bottom paint off. The next week the epoxy barrier coat was replenished and new Vivid white bottom paint was applied. The hulls were then buffed out and waxed. The nets were repaired and re-coated. A new spinnaker halyard exit block was installed on the mast and all halyards were replaced. The deck sheet stoppers were replaced with new Lewmar D2s. The float deck hatches were replaced. The Depth/Speedo was replaced, along with the compass. New soft shackles were made on rainy days. A new jib was made. And the list goes on..

Live Traffic Feed